Search results

Filter by

Remove filters

108 results found

basildon_cs2012_padc3

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc2

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc13

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc12

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc11

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc10

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_padc1

The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...

basildon_cs2012_majorurbanarea

The dataset was used in the development of the Core Strategy 2012 and shows the rough boundaries of Major Urban Area of Basildon...

basildon_cs2012_localnaturereserves

The dataset was used in the development of the Core Strategy 2012 and shows Local Nature...

basildon_cs2012_billericaytowncentre

The dataset was used in the development of the Core Strategy 2012 and shows the rough area of Billericay Town...

basildon_cs2012_floodzone3b

The dataset was used in the development of the Core Strategy 2012 and shows the area of Floodzone...

basildon_cs2012_allopenspace

The dataset was used in the development of the Core Strategy 2012 and shows all open space...

basildon_constraints2013_conservationareas

This dataset shows the planning development constraints for Conservation Areas from...

basildon_constraints2012_sssi

This dataset shows the planning development constraints for Sites of Special Scientific Importance from...

basildon_constraints2011_transmission247

This dataset shows the planning development constraints for Transmission Line 24/7 from...

basildon_constraints2011_tpo

This dataset shows the planning development constraints for Tree Preservation Orders from 2011.

basildon_constraints2011_psaabuffer

This dataset shows the planning development constraints for Buffer of Protected Species Alert Areas from 2011.

basildon_constraints2011_parishes

This dataset shows the planning development constraints for Basildon Parishes from 2011.

basildon_constraints2011_nationalgrid

This dataset shows the planning development constraints for National Grid from 2011.

basildon_constraints2011_listedbuildings

This dataset shows the planning development constraints for Listed Buildings from 2011.